Project: Slope stabilisation, Ilkley, West Yorkshire Client: Network Rail
Timescale: August to present date (work is on-going) Value: 3.5m
A 1km section of embankment carrying the line between Ben Rhydding and
Burley-in-Wharfedale was stabilised under a scheme designed by Atkins
Geotechnical Engineers and executed by Rail Services.
Remedial works included the introduction of subsurface drainage to
reduce ground water pressures, surface water drainage to control run-off
and prevent water ponding on the uphill side of the embankment and
follow on works to support the over steep embankment.
Works will include environmental reinstatement of trees and
landscaping.