Client: Highways Agency
Project: A11 Attleborough to Roudham Heath Dualing
Completed: 2004
Value: £32 million
This design and construct scheme, which was procured under NEC Option
C, involved the predominately on-line improvement to dual two lane carriageway
standard of around 10km of all-purpose grade separated road.
The project included three grade separated interchanges and seven bridges,
of which two are top down construction and two are reinforced earth construction.
The traffic management system was carefully designed to minimise
disruption to both traffic on the A11, and locally. |
| | |