Piled high
Our piling team is playing an important role in a new project in south London to provide a mix of accommodation reaching up nine storeys in a modern take on a 1960s classic.
In addition to the 271 apartments, the building at Stockwell Green will have a retail level on the ground floor and a basement car park.
We’ve been contracted to carry out a major piling operation consisting of about 1000 continuous flight auger (CFA) piles. These are for a horseshoe shaped retaining wall, which is partially load bearing, as well as for the foundations within the footprint to support the new structure.
The design meets a number of different needs, with a medley of piles differing in length and diameter, as well as steel reinforcement bars that range in length and number.
Click here to read the full story, courtesy of Ground Engineering magazine.
|